Agenda and draft minutes

Strategic Planning Committee - Monday 11th April, 2022 7.00 pm

Venue: Council Chamber, Council Offices, Swanspool House, Doddington Road, Wellingborough, Northants, NN8 1BP

Contact: Callum Galluzzo (Democratic Services)  Email: callum.galluzzo@northnorthants.gov.uk

Items
No. Item

SPC44

Apologies for absence

Minutes:

Apologies for absence were received from Councillors Bell, Allebone and Dearing.

 

It was noted that Councillor O’Hara was acting as a substitute for Councillor Allebone.  

 

SPC45

Members Declaration of Interests

Minutes:

None

SPC46

Minutes of the Meeting Held On 7th March 2022 pdf icon PDF 247 KB

Minutes:

RESOLVED              that the minutes of the meeting of the Planning                                               Committee held on 7th March 2022 be approved as a                                      correct record.

SPC47

Applications for Planning Permission, listed building consent and appeal information

Minutes:

The Committee considered the following applications for planning permission, whichwere set out in the Development Control’s Reports and supplemented verbally at the meeting.  

 

The reports included details of applications and, where applicable, results of statutory consultations and representations which had been received from interested bodies and individuals, and the Committee reached the following decisions:-

SPC48

NN/21/00058/WASVOC pdf icon PDF 416 KB

Additional documents:

Minutes:

Proposed Development

 

*4.1     Variation of condition 2 of planning permission ref. 20/00022/WASVOC to increase the stack height from 25m (currently permitted) to 35m at Storefield Plant, Gretton Brook Road Earlstrees Industrial Estate for ESF Energy Ltd

 

            Application No:

NN/21/00058/WASVOC

 

Speaker:

 

None

 

Decision

 

Members received a report about a proposal for which full planning permission was being sought for the variation of condition 2 of planning permission ref. 20/00022/WASVOC to increase the stack height from 25m (currently permitted) to 35m.

 

Members agreed that the application was satisfactory and raised no objection in contrary to the officers recommendation to approve the application

 

Following debate it was proposed by Councillor Waters and seconded by Councillor Marks that the application be approved in line with the officer’s recommendation.

 

It was agreed that the application be APPROVED subject to the following conditions:

 

The development to which this permission relates has commenced.

 

1.    Scope of Permission

 

          Except as otherwise required by conditions attached to this planning permission the development hereby permitted shall be implemented and maintained in accordance with the details, mitigation measures and recommendations in the following approved documents and plans submitted under planning permissions 08/00097/WAS, and 14/00093/WASVOC and 20/00022/WASVOC and Non-Material Amendment 13/00061/WASNMA:

           

          i. Submitted site plan, GPP/SE/GBR/08/04

          ii. Ecological Constraints Appraisal by Lockhart Garratt dated 7.10.08

          iii. Flood Risk Assessment by Abington Consulting Engineers dated 6 Jan 2009

          iv. Comprehensive access & highway improvement plan 07046/260 dated February 2009

          v. Proposed Site Layout Plan, drawing GL000015D4001 Revision PO3

          vi Proposed Elevations, drawing 201 Revision D, Proposed GA Elevations 154,000 Tonnes Per Year Throughput Proposed GA Elevations, 154,000 Tonnes Per Year Throughput, Drawing 201 Revision E

          vii Proposed Elevations, drawing 202 Revision B, Proposed GA Elevations 154,000 Tonnes Per Year Throughput Proposed GA Elevations 154,000 Tonnes Per Year Throughput, Drawing 202 Revision C

          vii. Air Quality Assessment by Air Quality Consultants Ltd dated April 2020

 

2.    The development hereby permitted shall not exceed a total annual throughput of 154,000 tonnes per annum.

 

3.    The developer shall ensure that systems are in place to ensure that the site accepts and processes only waste of a non hazardous nature and that systems are in place to deal with any prohibited wastes delivered to site.

 

4.    The applicant shall notify the Waste Planning Authority (WPA) in writing of the date upon which the proposed facility receives its first commercial import of waste for processing.

 

          Construction Hours of Working

 

5.    All works relating to construction or demolition shall be carried out only between the hours of 7.00am and 7.00pm Mondays to Fridays, 7.00am and 1.00pm on Saturdays thereafter and at no time on Sundays and Bank Holidays.

 

 

          Documentation

 

6.    From the date of the commencement and throughout development, a copy of this permission including all documents hereby approved and any other documents subsequently approved in accordance with this permission, shall always be on display at the site office for inspection during normal working hours.

 

          Odour and Dust

         

7.    Odour and dust shall be controlled in accordance  ...  view the full minutes text for item SPC48

SPC49

NN/21/00059/WASVOC pdf icon PDF 416 KB

Additional documents:

Minutes:

Proposed Development

 

*4.2     Variation of condition 2 of planning permission ref. 20/00023/WASVOC to increase the stack height from 25m (currently permitted) to 35m at Storefield Plant, Gretton Brook Road, Earlstrees Industrial Estate for ESF Energy Ltd

 

            Application No:

NN/21/00059/WASVOC

 

Speaker:

 

None

 

Decision

 

Members received a report about a proposal for which full planning permission was being sought for the variation of condition 2 of planning permission ref. 20/00023/WASVOC to increase the stack height from 25m (currently permitted) to 35m.

 

Members agreed that the application was satisfactory and raised no objection in contrary to the officers recommendation to approve the application

 

Following debate it was proposed by Councillor Marks and seconded by Councillor Armour that the application be approved in line with the officer’s recommendation.

 

It was agreed that the application be APPROVED subject to the following conditions:

 

 

          Commencement

 

1.    The development to which this permission relates has commenced.

 

          Scope of Permission

 

2.    Except as otherwise required by conditions attached to this planning permission the development hereby permitted shall be implemented and maintained in accordance with the details, mitigation measures and recommendations in the following approved documents and plans submitted under planning permissions 08/00097/WAS 09/00052/WAS, and 14/00093/WASVOC 14/00094/WASVOC and 20/00023/WASVOC and Non-Material Amendment 13/00061/WASNMA 13/00060/WASNMA:

           

          i. Submitted site plan, GPP/SE/GBR/08/04

          ii. Ecological Constraints Appraisal by Lockhart Garratt dated 7.10.08

          iii. Flood Risk Assessment by Abington Consulting Engineers dated 6 Jan 2009

          iv. Comprehensive access & highway improvement plan 07046/260 dated February 2009

          v. Proposed Site Layout Plan, drawing GL000015D4001 Revision PO3

          vi Proposed Elevations, drawing 201 Revision D, Proposed GA Elevations 154,000 Tonnes Per Year Throughput Proposed GA Elevations, 154,000 Tonnes Per Year Throughput, Drawing 201 Revision E

          vii Proposed Elevations, drawing 202 Revision B, Proposed GA Elevations 154,000 Tonnes Per Year Throughput Proposed GA Elevations 154,000 Tonnes Per Year Throughput, Drawing 202 Revision C

          vii. Air Quality Assessment by Air Quality Consultants Ltd dated April 2020

 

3.    The development hereby permitted shall not exceed a total annual throughput of 154,000 tonnes per annum.

 

4.    The developer shall ensure that systems are in place to ensure that the site accepts and processes only waste of a non hazardous nature and that systems are in place to deal with any prohibited wastes delivered to site.

 

5.    The applicant shall notify the Waste Planning Authority (WPA) in writing of the date upon which the proposed facility receives its first commercial import of waste for processing.

 

          Construction Hours of Working

 

6.    All works relating to construction or demolition shall be carried out only between the hours of 7.00am and 7.00pm Mondays to Fridays, 7.00am and 1.00pm on Saturdays thereafter and at no time on Sundays and Bank Holidays.

 

          Documentation

 

7.    From the date of the commencement and throughout development, a copy of this permission including all documents hereby approved and any other documents subsequently approved in accordance with this permission, shall always be on display at the site office for inspection during normal working hours.

 

          Odour and Dust

 

8.    Odour and dust  ...  view the full minutes text for item SPC49

SPC50

Delegated Officers Report

Minutes:

None

SPC51

Exempt Items

Minutes:

None

SPC52

Close of Meeting